Intelligent Transportation System

Headlining the FCC’s next open meeting, scheduled for November 18 is an item to adopt proposed rules to reallocate the 5.9 GHz band. The FCC would repurpose the lower 45 megahertz of the band for unlicensed use, while retaining the upper portion of the band for Intelligent Transportation Systems (“ITS”) operations and transitioning to Cellular Vehicle-to-Everything (“C-V2X”) technology. The Commission plans to seek additional comment on proposed technical rules for outdoor unlicensed use and on implementation timelines for transitioning to C-V2X. The November meeting will also consider two satellite items. The FCC plans to streamline its satellite licensing rules by creating an optional unified license system for satellite and earth station operations, and will propose a new allocation in the 17 GHz band for Fixed Satellite Service (“FSS”) space-to-Earth downlinks. Additionally, the Commission will propose expanding the contribution base for the Telecommunications Relay Services (“TRS”) Fund.

FCC regulatory will likely slow in the aftermath of the election and with an upcoming change in Administration. However, the Commission tees up two new rulemaking proceedings with the November agenda, signaling that the FCC may still be moving forward with policy initiatives  going into a transition period. You will find more details on the most significant November meeting items after the break:

Continue Reading FCC Highlights Reallocating the 5.9 GHz Band at November Open Meeting

On December 7, 2015, the U.S. Department of Transportation (DOT) issued a Notice of Funding Opportunity (NOFO) for “Beyond Traffic: The Smart City Challenge,” the first in a two-part solicitation for a federally funded program aimed at developing “a holistic, integrated approach to improving surface transportation performance within a city and integrating this approach to improving smart city domains such as public safety, public services, and energy.”  DOT will award $40 million to one mid-sized city that demonstrates how it will use the funds to address challenges such as congestion, safety, climate change, and improving connections with underserved communities.  Broadband providers that are considering deploying or expanding their networks in mid-sized cities may want to consider partnering with an eligible applicant to use some of the funds to either deploy new broadband infrastructure or add increased capacity to the existing network to accommodate new technology such as connected cars.  Initial applications for this grant opportunity are due on February 4, 2016.  DOT will then narrow the field to five finalists, and make a selection in June 2016.

Continue Reading DoT Announces “Smart City” Challenge to Increase Infrastructure Efficiency in Urban Areas